Bhutan Schedule of Rates 2012 (NEW)
The Department of Engineering Services, Ministry of Work & Human Settlement had published Bhutan Schedule of Rates 2012. Click on the following links to download the publications or the link will be in the right side of the screen in Publication Menu.
- Bhutan Schedule of Rates (civil)-2012 (pdf Format, Size:1.26MB)
- Bhutan Schedule of Rates (Electrical)-2012 (in pdf format, size: 1.63MB)
- Labour and Material Coefficient (Civil) 2012 (in pdf format, size: 4.19MB)
- Labour and Material Coefficient (Electrical) 2012 (in PDF format, Size:1.81MB)
- Specification for Building and road Works -2012 (in PDF format,Size:9.61MB)
- Specification for Electrical works – 2012 (in PDF format,Size: 2.16MB)
Note: Hard-copies are available with the Department of Engineering Services with the following rates(Nu).
- Bhutan Schedule of Rates (civil)-2012 @ Nu: 189 only
- Bhutan Schedule of Rates (Electrical) 2012 @ Nu: 262 only
- Labour and Material Coefficient (Civil) 2012 @ Nu: 534 only
- Labour and Material Coefficient (Electrical) 2012 @ Nu: 1340 only
- Specification for Building and road Works -2012 @ Nu:746 only
- Specification for Electrical works – 2012 @ Nu: 698 only
For further information please contact the following telephone numbers:
#+975-2- 324337
# +975-2-324432