"Construction Industry: Solutions through innovation and improved technology"
Home » Page 165

ADDENDUM/CORRIGENDUM(Gyelposhing-Nganglam Road Project)

September 18th, 2012 Posted in Tender Notifications By: gn_highway

This is with reference to NIT No. DoR/GNRP/2012-2013/Works-01/54 which was published on dated August 25, 2012:-

1. ADDENDUM:-

All prospective bidders are hereby requested to include duly filled and signed Integrity Pact(IP) along with the bids. Acopy of the IP may be downloaded from the link provided:- To download the Integrity Pact:- Click here

2. CORRIGENDUM:-

I. Following changes are to be noted for Package-3

a. The unit for BoQ item No. 10(RC0090) to be read as Sq.m instead of Cu.m

b. The unit for BoQ item No. 11(CW0005) to be filled with Cu.m

c. Providing and laying of Base Course, Bitumen Sealing, C/o L-drain and Cross Drainage from Ch. Km. 32.00 – Km 42.00 shall be read as Ch. Km 32.00 – Km 42.60 for Package 3 from Nganglam side on GNRP

II. For Package 5:- The quantity of GI pipe 90-80mm dia in the Sl.No. 13 of BoQ shall be read as 24.00 mtr instead of 350.00 mtr.

Invitation for bids.

September 18th, 2012 Posted in Tender Notifications By: phuentsholing_fd

Sealed bids are invited from eligible Medium Class Bhutanese Contractors registered with CDB and holding valid trade licence for the following works.

  1. Construction of Permanent Works on Phuentsholing-Samtse Highway (Km 16-25) and Samtse-Phuntsholing Highway (Km 17-20 ) click here
  2. Construction of Lined drains on Phuntsholing-Samtse Highway (Km 15-20) click here
  3. Construction of Lined drains on Phuntsholing-Samtse Highway (Km 20-25) click here