Disclosure of Resettlement Plan (RP) for construction of Waste Water Treatment Plant (WWTP) at Babesa: Urban Project, BHU-2816.

Department of Engineering Services (DES), MoWHS as the Executing Agency (EA) is implementing construction of 12 MLD WWTP at Babesa. As mandated by the project document, the RP has been prepared for WWTP.  For detail, Click Here.

Print Friendly, PDF & Email
Updated: March 8, 2019 — 3:04 pm