ENGINEERING ADAPTION AND RISK REDUCTION DIVISION
Bhutan Schedule Rates:
- Framework for Quality Control and Quality Assurance
- BSR 2021 (civil)
- BSR 2021 (Electrical)
- LMC 2021 (Civil)
- LMC 2021 (Electrical)
- Specification 2021 (Electrical)
- SBRW 2021
- Addendum 1: OHS item description, and Addendum 2: Guideline on Project Estimation
- Guideline for OHS Cost
- BSR 2020 (CIVIL)
- BSR 2020 (ELECTRICAL)
- LMC 2020 (CIVIL)
- Windstorm Resilient Roofing System
- Vulnerability Assessment Guideline for Load Bearing Structures
- SPBW 2020
- BSR Electrical 2018
- BSR 2018 (civil)
- BSR (Electrical) 2017
- LMC (Civil) 2017
- LMC (Electrical) 2017
- SBRW(CIVIL) 2017
- SEW (Electrical) 2017
- BSR Civil,2015
- LMC Civil, 2015
- BSR Electrical,2015
- LMC Electrical,2015
- Specification Electrical,2015
- Bhutan Schedule of Rates 2013 Civil
- LMC civil 2013
- Bhutan Schedule of Rates 2013 Electrical
- LMC 2013 Electrical
- SEW 2013 Electrical
- SBRW civil
- Bhutan Schedule of Rates 2012 Civil
- Bhutan Schedule of Rates 2012 Electrical
- Bhutan Schedule of Rates 2011